Activity

  • bb254 replied to the topic "Deviations That Occurs During Verification"5 years, 10 months ago

    Deviations that come from the verification step of a design control always causes a havoc at work. Recently, I was trying to qualify a modified fixture for use on the production floor. The drawing was completed, the fixture was built…   Read more»