-
bsk32 replied to the topic "Design Verification Failures" – 2 months, 1 week ago
If the cause of failure was with the device design, then verification will take longer, and the timeline should be anticipated to be pushed back. As a project manager, I would confer with the Engineering team to conduct a root… Read more»