-
hc255 replied to the topic Best timing for validation and verification in the forum Introduction to Project Management 7 years, 4 months ago
Verification and Validation should be done in accordance with Design Controls to ensure proper alignment with correct processes. Verification should be completed after outputs of a design have been established. Then as the device is being reviewed, validation should be conducted as well. I currently am part of the remediation team so I run validations on test methods to ensure that the process for each component/subassembly/assembly of the product is within specifications.