Activity

  • In the control phase any financial values can change based on the project dynamics. Usually the cost can be seen in the phase before the control phase and after where resources are established and assigned to a specific need. However, if in the control phase it is noticed that resources need to be readjusted, the actual cost can change. There are many aspects of the project that can affect the cost variable and with that in mind, projects can be designed with the risk of these dynamics considered.