pi29 replied to the topic Best timing for validation and verification in the forum Introduction to Project Management 6 years, 7 months ago
I believe that verification of the product comes first and is followed by validation. Verification I would think happens towards the middle or after the midpoint of the project development and is followed by validation. A semi-final design is needed and has to be made in order for verification of that design and validation of that design to occur.If that design fails then the requirements have to be changed and verification and validation occur again until the final design passes.