EJ851996

Forum Replies Created

RE: Problem with the Vendors

The first thing to do is connect with the vendor to clarify where the problem is. Figuring out where does wrong is the most important thing. If the vendor can't fix the problem, choosing the next vend...

In forum Project Management Process and Medical Device Development

2 years ago
RE: Animals used for research and for food

I think this phenomenon results from people believing the animal was tortured before being sacrificed. In fact, researchers won't give too much pain in the animal models. The additional pain would aff...

In forum Pre-clinical Device Development

2 years ago
RE: Ethics of Animal Testing

I believe that the animal model still is necessary for medical device development. We're indeed harvesting other lives for our own purpose. But completely stopping the animal test would cause disaster...

In forum Pre-clinical Device Development

2 years ago
RE: Onsite or Remote (Work)

I prefer to work remotely. It's very convenient for me to arrange my time more flexibly. However, as mentioned above, it depends on the job type. Full-time remote working is available for some drawing...

In forum Introduction to Medical Device Development

2 years ago
RE: Improvements in Telehealth through Medical Devices

Developing a new digital medicare way is an innovative way. There must be a lot of problems that need to solve. However, I believe telehealth and digitalization are an advantage in the long term. Tele...

In forum Introduction to Medical Device Development

2 years ago
RE: Penalization for Going Over Budget and Time?

I don't think personal punishment is necessary. As the topic mentioned, there are several unexpected things that would happen and slow down the project process. The manager usually remains time for th...

In forum Project Management Process and Medical Device Development

2 years ago
RE: How poor planning affects a project

I didn't work in the industry before, but I have worked in a lab as an assistant before. It was the time that the pandemic was most serious. We need to follow the policy of our university that control...

In forum Project Management Process and Medical Device Development

2 years ago
RE: In planning, the method to calculate each task duration.

As Dr. Simon mentioned in the video, there are several ways to calculate the duration time in different breakdown structures. It helps a lot in calculating the total time cost for the whole project. H...

In forum Project Management Process and Medical Device Development

2 years ago
RE: Time vs. Money

I also agree that everything begins with money. If there is no money, nothing goes on. Placing profit before everything is how most companies work. Optimizing the process for the shortest time to gain...

In forum Project Management Process and Medical Device Development

2 years ago
RE: Design Control Process

I don't work in the industry before. I only have a little working experience in academics as a research assistant. My job was to find the most stable method to condense the polymer. I need to optimize...

In forum Introduction to Project Management

2 years ago
RE: Design Review Meeting

I used to be one of the research assistants in an academic lab a few years ago. It was the most severe period of the pandemic then. Our university asked us to limit members to less than four a day in ...

In forum Introduction to Project Management

2 years ago
RE: Funding in Medical Devices Industry

Suppose that the idea is perfect and nobody has funded it yet. I think the company will apply for a patent first. Even though the company doesn't have enough budget to initiate this project, applying ...

In forum Introduction to Project Management

2 years ago
Several modifications of verification at the same time

This week, we have our first group simulation. We suggested multiple modifications in the verification instruction at one time. The simulation worked, but Dr. Simon asked us to specify which step solv...

In forum Introduction to Project Management

2 years ago
RE: Experiments

When I was looking at the simulation instructions, there were several ideas popped up in my mind. The first thing I suspect is, does the employee follow the instruction strictly? Then I will suspect t...

In forum Introduction to Project Management

2 years ago
RE: Determining project priority

I agree that the company should hire more people to keep all projects working simultaneously. Keeping working at high intensity would result in lower performance and employee turnover. It is harmful t...

In forum Introduction to Project Management

2 years ago
Page 2 / 6