-
jjp93 replied to the topic Consequences Of Insufficient Design Controls in the forum Introduction to Design Controls 6 years, 5 months ago
I believe that the design control portion can be used insufficiently if there aren’t proper design review meetings or if these meetings are not facilitated correctly. These meetings are used to help create the product without any faults or misunderstandings between departments but these meetings aren’t there or are off topic, there can be many issues that arise and can extend the timeline of the product. Also some issues that could arise from the process is if one department misunderstands what another department is saying and then the design is delayed. This section also requires a lot of documentation which can take up a lot of time but it is for the good of the product. There are issues where it takes a lot of time to change a document or procedure when there is a more efficient way to do things which can extend the timeline. These documents should be looked over many times and see if there are other efficient ways to do things from the beginning then having to make the changes later on. This part of the product should also give enough room for how long everything will take otherwise people can rush and make mistakes while trying to meet a deadline.