Forum Replies Created
RE: Risk Management - Identification Risk identification and assessment can extend towards to human factors as well. The following are a few Devices used in an improper manner. Devices not manufactured and developed with appropriate spec... |
In forum Risk Analysis for Medical Devices |
8 years ago |
RE: Factors Contributing to Risk Values According to an article, Summing the factors of all individual hazards to determine their cumulative effect is reasonably valid assuming all hazards occur simultaneously or within a short enough perio... |
In forum Risk Analysis for Medical Devices |
8 years ago |
RE: Manage Risk Risk Management is the process of identifying, analyzing and responding to risk factors throughout the life of a project and in the best interests of its objectives. Proper risk management implies con... |
In forum Risk Analysis for Medical Devices |
8 years ago |
RE: Making up tests for design verification and validation Verification and Validation go hand in hand. They cover every phase of product development and it is always considered from the very beginning. Material performance, Package quality tests, Bio compati... |
In forum Introduction to Design Controls |
8 years ago |
RE: What are Design Controls? A Design Transfer Procedure makes sure of mishaps do not occur during the transfer process. The procedure is typically overseen by the medical device company’s management. Design Change Procedures mu... |
In forum Introduction to Design Controls |
8 years ago |
RE: Important Part of DDP I would like to mention about EAP program, which stands for EXPEDITED ACCESS PATHWAY. It basically to aid and benefit patients who have not met their medical need, due to criteria issues. This program... |
In forum Introduction to Design Controls |
8 years ago |